Two Offshore Substation Topsides Neart na Gaoithe - OSS-S and OSS-N - 225 MW
Offshore substation topsides OSS-S and OSS-N for the 450 MW Neart na Gaoithe (NnG) offshore wind farm off the Fife coast in Scotland. The offshore substations are a key element for exporting energy production from the wind farm. The topsides will include the main electrical equipment for connecting the wind farm to the onshore grid.
- LocationScottish North Sea
- Dimensions35x25.5x15 metres each
- Weight1200 tonnes each
- Capacity225 MW single HV transformer 66kV/220kV each
- Contract AwardDecember 2019
- CompletionSummer 2022
- ContractEPCC
- ClientNNG, Neart na Gaoithe Offshore Wind Ltd. (EDF/ESB) in consortium with UK Grid Solutions Limited (GE)
- Consultant/EngineerIv-Offshore & Energy