E17a-A Compression Module
July 2015 - Neptune Energy (formerly ENGIE E&P Nederland BV)
Procurement, fabrication, pre-commissioning, load-out and inland transport of the E17a-A compression module.
July 2015 - Neptune Energy (formerly ENGIE E&P Nederland BV)
Procurement, fabrication, pre-commissioning, load-out and inland transport of the E17a-A compression module.
August 2014 - Shell U.K. Limited
Procurement, fabrication, testing and commissioning of a compression platform for the Shell Leman Uptime Compression Project.
August 2013 - Repsol Sinopec Resources UK
Procurement, construction, commissioning, load-out and seafastening of the Claymore Compression Upgrade (CCU) module.
August 2006 - Spirit energy (formerly Centrica / CH4 Nederland BV / Venture)
Engineering, procurement, fabrication, load-out and seafastening of a gas compression and riser platform, bridge linked to the existing J6A Markham platform.
August 2006 - Talisman
Engineering, procurement, fabrication, testing, (pre)commissioning, load-out and seafastening of the Wood and Gas Export (WaGE) gas compression and treatment module for the (existing) Montrose A platform.
October 2004 - NAM
Compression modification project consisting of 170 tonnes compression module, 10 tonnes slug catcher frame and offshore modifications.
July 2003 - ConocoPhillips
The new CMS III MC2 compression module shall provide compression facilities on the Murdoch Compression (MC) platform in parallel to the existing compression train (MC1) in order to process and accelerate the gas production of 5 new fields.
December 1998 - Stork E&C
Two Compression Modules TP42 and TP46 for the Jotun Floating Production/Storage/Offloading (FPSO). The Jotun FPSO has processing facilities for 90,000 barrels of crude per day.
September 1998 - Total
The Booster Module consists of a 5 MW gas turbine and a two stages compressor with associated equipment as fuel gas unit, scrubbers, gas coolers, oil cooler and ducting/silencers.
April 1997 - BP
The Schiehallion FPSO (Floating Production/Storage/Offloading) has two gas-oil-water separation trains, designed for a total capacity of 145,000 barrels of oil per day.
June 1995 - Unocal
The Q1 Hoorn Gas Process Module will compress (70-80 bar), dry and measure the wet gas from the Q1 Halfweg platform.
August 1987 - Norsk Hydro
The two compression modules M01 and M02 are part of the Oseberg 'A' gravity base structure. In order to maintain the reservoir pressur, injection gas will be used.