A15 - B10 Development Project
April 2023 - Petrogas Transportation BV
Two identical gas production platforms with a two-deck topside production facility.
April 2023 - Petrogas Transportation BV
Two identical gas production platforms with a two-deck topside production facility.
Quarter 2 - 2021 - Independent Oil and Gas PLC (IOG)
Design, engineering, procurement, construction and installation of the Blythe normally unmanned installation (NUI) platform.
Quarter 2 - 2021 - Independent Oil and Gas PLC (IOG)
Design, engineering, procurement, construction and installation of the Southwark normally unmanned installation (NUI) platform.
November 2020 - Dana Petroleum Netherlands BV
Gas production platform with a two-deck topside production facility to support two production wells.
September 2015 - Petrogas E&P Netherlands BV
Detailed engineering, procurement, construction, pre-commissioning, load-out, transport, installation and hook-up of the A18 platform.
August 2014 - Shell U.K. Limited
Procurement, fabrication, testing and commissioning of a compression platform for the Shell Leman Uptime Compression Project.
June 2013 - Neptune Energy (formerly ENGIE E&P Nederland BV / GDF Suez E&P Nederland BV)
Fabrication, load-out and sea-fastening of well protector platform L5a-D and topside D18-A.
July 2013 - EOG Resources UK
Design, procurement, construction, installation (EPCI) and hook-up of a wellhead platform and reception module.
April 2011 - Petrogas Transportation BV
Engineering, procurement, fabrication, transport/installation and hook-up/commissioning.
September 2010 - Total E&P Nederland BV
Engineering, procurement and fabrication of jacket and topsides. The platform consists of 8 slots, gas processing equipment, power generation (diesel and gas), helideck, emergency shelter and 2 risers (10" export and 3" DEG).
July 2009 - Neptune Energy (formery Engie E&P Nederland BV / GDF Suez E&P Nederland BV)
Fabrication of jacket and topsides for the E17a-A field. The topside consists of 4 decks and is equipped with a living quarter and a helideck.
November 2008 - Ithaca Energy
A normally unmanned platform remotely controlled from the Beatrice Alpha platform.
August 2006 - Spirit Energy (formerly Centrica / CH4 Nederland BV / Venture)
Engineering, procurement, fabrication, load-out and seafastening of a gas compression and riser platform, bridge linked to the existing J6A Markham platform.
July 2003 - Wintershall
Production platform consisting of gas production deck, 22 person EPC living quarter with helideck, jacket and 8 skirt piles.
June 2003 - Shell
Jacket with riser protection frame and 4 leg piles (4 lead sections and 8 add-ons) for Shell Carrack QA Platform.
June 2001 - Total
Jacket with 4 skirt piles. The buoyancy of the jacket was used for turning over the jacket during offshore installation.
June 2000 - Total E&P Nederland BV
Satellite Platform consisting of topsides, jacket and piles. Topsides include six person emergency accommodation facilities and a helideck.
June 1999 - Total
Satellite platform consisting of topsides, jacket and piles. Topsides includes 6 person emergeny accommodation facilities and a helideck.
September 1998 - Total
The jacket is part of the satellite platform consisting of topsides, jacket and piles. Topsides include six person emergency accommodation facilities and a helideck.
December 1996 - NAM
Satellite platform consisting of topsides, jacket and piles. Topsides includes 6 person emergeny accommodation facilities and a helideck.
May 1994 - Total
All jackets have legpiles. K5PA has 6 slots, 1 pre-installed conductor and 2 risers. K5PD has 6 slots and 1 pre-installed conductor.
April 1993 - Nederlandse Aardolie Maatschappij (NAM)
The quarters platform consists of an integrated topside, jacket, piles and a spacer frame.