Tyra West Upper Pipe Bridge
The Upper Pipe Bridge links the IPF module and the Tyra West Bridge Module of the Tyra West Platform complex. The bridge is part of a major extension of the existing production facilities including the installation of new gas processing facilities and a bridge module.
- LocationTyra West block 5504/11-12
- DimensionsLength 98 metres Width 6 metres Height 7 metres
- Weight260 tonnes
- Contract AwardJune 1995
- CompletionJanuary 1996
- ContractPC
- ClientMaersk Olie og Gas