A15 - B10 Development Project
April 2023 - Petrogas Transportation BV
Two identical gas production platforms with a two-deck topside production facility.
April 2023 - Petrogas Transportation BV
Two identical gas production platforms with a two-deck topside production facility.
Quarter 2 - 2021 - Independent Oil and Gas PLC (IOG)
Design, engineering, procurement, construction and installation of the Blythe normally unmanned installation (NUI) platform.
Quarter 2 - 2021 - Independent Oil and Gas PLC (IOG)
Design, engineering, procurement, construction and installation of the Southwark normally unmanned installation (NUI) platform.
November 2020 - Dana Petroleum Netherlands BV
Gas production platform with a two-deck topside production facility to support two production wells.
May 2017 - Nederlandsche Aardolie Maatschappij (NAM
Fabrication, pre-commissioning, load-out and seafastening of the Monotower Platform L13-FI-1.
September 2015 - Petrogas E&P Netherlands BV
Detailed engineering, procurement, construction, pre-commissioning, load-out, transport, installation and hook-up of the A18 platform.
August 2014 - Shell U.K. Limited
Procurement, fabrication, testing and commissioning of a compression platform for the Shell Leman Uptime Compression Project.
June 2013 - Neptune energy (formerly ENGIE E&P Nederland BV / GDF Suez E&P Nederland BV)
Fabrication, load-out and sea-fastening of well protector platform L5a-D and topside D18-A.
July 2013 - EOG Resources UK
Design, procurement, construction, installation (EPCI) and hook-up of a wellhead platform and reception module.
April 2011 - Petrogas Transportation BV
Engineering, procurement, fabrication, transport/installation and hook-up/commissioning.
September 2010 - Total E&P Nederland BV
Egineering, procurement and fabrication of jacket and topsides. The platform consists of 8 slots, gas processing equipment, power generation (diesel and gas), helideck, emergency shelter and 2 risers (10" export and 3"DEG).
July 2009 - Neptune Energy (formerly ENGIE / GDF Suez E&P Nederland BV)
Fabrication of jacket and topsides for the E17a-A field. The topside consists of 4 decks and is equipped with a living quarter and a helideck.
November 2008 - Ithaca Energy
A normally unmanned platform remotely controlled from the Beatrice Alpha platform.
June 2007 - Nederlandse Aardolie Maatschappij bv en Shell UK Ltd.
Framework agreement for the fabrication, procurement, hook-up and commissioning of standardised monotower platforms.
August 2006 - Spirit Energy (formerly Centrica / CH4 Nederland BV / Venture)
Engineering, procurement, fabrication, load-out and seafastening of a gas compression and riser platform, bridge linked to the existing J6A Markham platform.
July 2005 - Neptune Energy (formerly ENGIE / GDF Suez E&P Nederland BV)
Fabrication, testing, load-out and seafastening of the topside facilities for the G17d-AP platform and the K2b-A platform.
July 2003 - Wintershall
Production platform consisting of gas production deck, 22 person EPC living quarter with helideck, jacket and 8 skirt piles.
June 2000 - Total E&P Nederland BV
Satellite Platform consisting of topsides, jacket and piles. Topsides include six person emergency accommodation facilities and a helideck.
June 1999 - Total
Satellite platform consisting of topsides, jacket and piles. Topsides includes 6 person emergeny accommodation facilities and a helideck.
September 1998 - Total
Satellite platform including six person emergency accommodation, piles and a helideck.
April 1993 - Nederlandse Aardolie Maatschappij (NAM)
The quarters platform consists of an integrated topside, jacket, piles and a spacer frame.
August 1985 - NAM
The EPCI project scope contains the gas production platform, 24-person accommodation module, helideck, vent/microwave tower, bridge and 12 slot wellhead deck.