Two identical gas production platforms with a two-deck topside production facility to support four productions wells and the minimum of associated utility and control systems. Piled foundation, the tripods are each connected to their piles with a swaged connection.
- LocationA/B Block, Dutch North Sea
- DimensionsTopside 11 x 9 x 5.5 meters
Jacket 38 x 34 x 49 meters
- WeightTopside 51 tonnes each
Jacket 467 tonnes each
Piles 243T tonnes per platform
- Contract AwardApril 2022
- CompletionApril 2023
- ContractEPC
- ClientPetrogas Transportation BV
- Consultant/EngineerEnersea