A15 - B10 Development Project

Two identical gas production platforms with a two-deck topside production facility to support four productions wells and the minimum of associated utility and control systems. Piled foundation, the tripods are each connected to their piles with a swaged connection.

  • LocationA/B Block, Dutch North Sea
  • DimensionsTopside 11 x 9 x 5.5 meters
    Jacket 38 x 34 x 49 meters
  • WeightTopside 51 tonnes each
    Jacket 467 tonnes each
    Piles 243T tonnes per platform
  • Contract AwardApril 2022
  • CompletionApril 2023
  • ContractEPC
  • ClientPetrogas Transportation BV
  • Consultant/EngineerEnersea

 

Back to overview