Pre-Assembled Unit (PAU) for Shell
In order to use plastic waste to create new plastics, Shell has developed a solvent extraction process to clean the pyrolysis oil to make the it more suitable to feed into the existing processes. With the Pre-Assembled Unit (PAU) a significant part of the process equipment can be installed and connected off site of Moerdijk in order to reduce the works on site of Moerdijk. HSM is responsible for procurement of the steel and the full fabrication of the module.
- LocationMoerdijk, The Netherlands
- Dimensions18x9x19 metres
- Weight250 tonnes
- Contract AwardJuly 2022
- CompletionJune 2023
- ContractPC
- ClientShell Chemie BV
- Consultant/EngineerFluor