A15 – B10 Development Project
Two identical gas production platforms with a two-deck topside production facility to support four productions wells and the minimum of associated utility and control systems.
Two identical gas production platforms with a two-deck topside production facility to support four productions wells and the minimum of associated utility and control systems.
Piled foundation, the tripods are each connected to their piles with a swaged connection.