A15 – B10 Development Project

Two identical gas production platforms with a two-deck topside production facility to support four productions wells and the minimum of associated utility and control systems.

Client Petrogas Transportation BV
Location A/B Block, Dutch North Sea
Contract EPC
Contract award April 2022
Completion April 2023
Consultant/Engineer Enersea

Project information

Piled foundation, the tripods are each connected to their piles with a swaged connection.

Dimensions
  • Topside 11 x 9 x 5.5 meters
  • Jacket 38 x 34 x 49 meters
Weight
  • Topside 51 tonnes each
  • Jacket 467 tonnes each
  • Piles 243 tonnes per platform