Borkum Riffgrund 2 Offshore High Voltage Substation – 450 MW
Detailed design (partly), procurement, construction, commissioning, load-out, transport and hook-up of a high voltage AC transformer platform.
Detailed design (partly), procurement, construction, commissioning, load-out, transport and hook-up of a high voltage AC transformer platform.
The Offshore Substation will be part of the establishment of the 450 MW Borkum Riffgrund 2 offshore wind farm. The purpose of the Offshore Substation is to collect the electrical energy from the offshore wind farm, transform it to a higher voltage level and deliver the power to shore.