HORNS REV C Offshore High Voltage Substation – 400 MW
Detailed design (partly), procurement, construction, commissioning, load-out, transport and hook-up of the AC transformer topside.
Detailed design (partly), procurement, construction, commissioning, load-out, transport and hook-up of the AC transformer topside.
As part of the establishment of the 400 MW Horns Rev C offshore wind farm, Energinet.dk has been appointed by the Danish authorities to provide the AC transformer and the associated connection to the grid via high voltage submarine cable. The purpose of the offshore AC transformer platform is to collect the electrical energy from the offshore wind farm, transform it to a higher voltage level and bring it to shore.