Leman Uptime Compression Platform

Procurement, fabrication, testing and commissioning of a compression platform for the Leman Uptime Compression Project.

Client Shell U.K. Limited
Location Leman Field, UK Southern North Sea
Contract EPC
Contract award November 2012
Completion August 2014
Consultant/Engineer Iv-Offshore & Energy

Project information

The work comprises a topside which houses a 2-stage LP- and a 1-stage HP gas compressor, both gas turbine driven, with ancillaries such as scrubbers, coolers and fuel gas treatment. The topside is supported by a 4 legged, piled through the legs, jacket and bridge -linked to the existing Leman ‘A’ Complex. Jacket and bridge are also part of the work.

Dimensions
  • Topside 41 x 41,5 x 30 metres
  • Jacket 22 x 22 x 48 metres
  • Bridge 37 x 4 x 4 metres
Weight
  • Topside 3570 tonnes
  • Jacket 800 tonnes
  • Piles 755 tonnes
  • Bridge 130 tonnes