N05-A Platform

ONE-Dyas discovered the N05-A field in August 2017. This field is partly located in the Dutch North Sea and partly in the German North Sea. Company will develop the N05-A field with a NNMI (Not Normally Manned installation) and APL (Autonomous Production Location) gas / condensate production process.

Client ONE-Dyas
Location Dutch North Sea / German North Sea
Contract C
Contract award July 2022
Completion July 2024
HSM Offshore Energy Completes Successful Load Out and Sail Away of NO5-A Topside and Jacket

Project information

The Living Quarter will be designed as a permanent manned installation, nevertheless the Platform N05-A will be operated as a NNMI. The export route is a pipeline to a side tap in the NGT.

The N05-A project concerns the development of an offshore platform (topsides and 6 legged non-battered jacket) with 10 well slots (8 producing and 2 spare slots ) with an installed production capacity of 6 MNm3/day including an allowance for production via incoming risers of 2.5 MNm3/day.

Dimensions
  • Topside 61,5 x 34 x 15 metres
  • Jacket 40 x 20 x 50 metres
Weight
  • Topside 3200 tonnes
  • Jacket 2800 tonnes
  • Piles 1800 tonnes

Project Overview N05-A Topside and Jacket

HSM Offshore Energy Rolls Out N05-A Topside
ONEDyas N05-A + Riffgat render 8 (2)