P11B Unity Development Project

Gas production platform with a two-deck topside production facility to support two production wells and associated utility and control systems. Piled foundation, each leg is piled into the seabed with a swaged connection.

Client Dana Petroleum Netherlands BV
Location Dutch North Sea
Contract (E)PCI
Contract award November 2019
Completion November 2020
Consultant/Engineer Enersea

Project information

Dimensions
  • Topside 10 x 8 x 5.5 meters
  • Jacket 27 x 30 x 49 meters
Weight
  • Topside 35 ton
  • Jacket 345 ton
  • Piles 170 ton