THOR OHVS for RWE – 1060 MW

RWE will build the Thor wind farm off the Danish west coast – approximately 22 kilometres from Thorsminde on the west coast of Jutland.

Client RWE Renewables
Location Danish North Sea
Contract EPCIC
Contract Award April 2023
Completed Sail Away Summer 2025 Take-over Q4 2026
Consultant/Engineer Iv-Offshore & Energy
HSM-Offshore-Energy-THOR-OHVS

Project information

With a planned capacity of 1060 MW, Thor will be Denmark’s largest offshore wind farm to date. To connect the wind farm to the Danish grid, RWE will build two new substations – one at sea and one on land. The substation at sea is the nerve centre of the wind farm: the electricity produced by the individual wind turbines is collected here and transformed to transmission-level voltage. The green electricity will be transported through export cables to the new-build onshore substation Volder Søndervang, which is located close to the coastline and the adjacent grid connection point of the Danish grid operator, Energinet. A corresponding grid connection agreement has already been signed between RWE and Energinet in spring 2022. HSM Offshore Energy will supply engineering, procurement, construction, installation and commissioning of the offshore high voltage substation and it’s jacket foundation.

Dimensions
  • Topside 39x36x18 metres (lxbxh)
  • Jacket 40x40x50 metres (lxbxh)
Weight
  • Topside 2.600 MT
  • Jacket 2.200 MT
Capacity
  • 1060 MW

Project Overview THOR OHVS 1060 MW